Kitchen Remodel Scope and Sequence Check

Find gaps before work starts.

Added October 15, 2026. Written with AI assistance and checked for clarity and placeholders; not reviewed by a lawyer, accountant, clinician or other professional. How these prompts are made

The Open buttons send the prompt text as currently shown below to that site only when you click. Fill in the placeholders first.

[VERIFY] is an editorial flag, not a blank to fill. Wherever the prompt shows [VERIFY], check that item against a reliable source before you use it (what [VERIFY] means).

Check my kitchen remodel plan. Scope, drawings described in words, appliance list, trades and timeline: [KITCHEN_PLAN]. Budget: [BUDGET]. Living arrangements during works: [LIVING_ARRANGEMENTS].

Check that services (electric, gas, water, ventilation) are considered, lead times for cabinets and appliances are included, measurements are verified before ordering, and a temporary kitchen is planned. Flag items that need certified work.

Return a table with Item, Gap and Fix, a lead-time timeline, and contingency suggestions. Permits and safety rules are [VERIFY] for [JURISDICTION].

Also suggest a schedule that keeps one working water supply and cooking area where possible, a decision date for every selection that has a lead time, and a snag list at the end. Add a reminder to confirm warranty conditions and installation requirements with suppliers.

Do not assume building codes. Name the kind of rule that may apply, tag it [VERIFY] for [JURISDICTION], and remind me to confirm permits and inspections with the local authority.

Close with a prioritised list of five fixes, each with the time it should take, the skill it needs and the person who could do it.

Fill in before use

Optional: type your details and the prompt above updates. Nothing is saved or sent.

Replace each bracketed placeholder with your own details, then paste into Any AI or another assistant.

See an example result (fictional data)
Gap table (invented plan)
Services: gas hob move not mentioned; needs a qualified engineer and approvals [VERIFY]. Red.
Ventilation: extractor ducting route not defined. Amber.
Appliances: oven 12-week lead time, cabinets 8 weeks; order before demolition. Amber.
Measurements: cabinet supplier will measure after the walls are finished; not in timeline. Amber.
Temporary kitchen: none planned; the works last about 5 weeks. Amber.
Timeline: demolition week 1, first fix week 2, plaster and dry week 3 to 4, cabinets week 5, worktops week 6 (templating after cabinets), second fix week 7, snag week 8.
Contingency suggestion: confirm with quotes.

Illustrative only, made-up data. Your results will differ and must be reviewed.