Bathroom Renovation Plan Check

Check sequence, gaps and professional needs.

Added October 15, 2026. Written with AI assistance and checked for clarity and placeholders; not reviewed by a lawyer, accountant, clinician or other professional. How these prompts are made

The Open buttons send the prompt text as currently shown below to that site only when you click. Fill in the placeholders first.

[VERIFY] is an editorial flag, not a blank to fill. Wherever the prompt shows [VERIFY], check that item against a reliable source before you use it (what [VERIFY] means).

Check my bathroom renovation plan. The plan, sequence of work and who will do each task: [RENOVATION_PLAN]. Layout changes: [LAYOUT_CHANGES]. Budget and timeline: [BUDGET_TIMELINE].

Check the order of trades, waterproofing and ventilation considered, electrical and plumbing work flagged for qualified people, access for deliveries, time for drying and curing as stated by manufacturers, and a plan if the bathroom is out of use. Identify missing steps.

Return a sequence table with Step, Dependency, Professional needed? and Risk (red, amber, green), and a question list for contractors. Permits and standards are [VERIFY] for [JURISDICTION].

Also check whether the plan covers the removal of old fittings, disposal, protecting adjoining rooms, and the order of tiling, painting and fixtures. Add a list of the questions to ask each trade about their timing and what they need from the previous trade to start.

Safety first: for electrical, gas, structural or load-bearing work say plainly when a licensed professional or permit is needed, and tag the rule [VERIFY] for [JURISDICTION]. Treat costs as estimates.

Fill in before use

Optional: type your details and the prompt above updates. Nothing is saved or sent.

Replace each bracketed placeholder with your own details, then paste into Any AI or another assistant.

See an example result (fictional data)
Sequence check (invented plan)
Step 3 tiling is scheduled before waterproofing is mentioned. Red.
Ventilation fan not in the plan. Amber.
Electrical work (new shaver socket and lights) listed as DIY. Red: qualified electrician needed; confirm permit rules [VERIFY].
Delivery of bath: 6 weeks lead time not in the timeline. Amber.
Plumbing first fix and second fix not separated. Amber.
Bathroom out of use: 3 weeks; no plan for washing facilities. Amber.
Questions for contractors: who tests for leaks before tiling, what is the drying time, who removes waste? Costs are estimates only.

Illustrative only, made-up data. Your results will differ and must be reviewed.