Create intermediate Works with: Any AI

Azure DevOps Sprint Planning Pack From a Backlog Export

Table output Has example

Prepare capacity, goal and sprint backlog.

The Open buttons send the prompt text as currently shown below to that site only when you click. Fill in the placeholders first.

[VERIFY] is an editorial flag, not a blank to fill. Wherever the prompt shows [VERIFY], check that item against a reliable source before you use it.

Rate this prompt

Loading ratings…

Prepare a sprint plan for Azure DevOps. Backlog export (title, state, effort, priority, tags): [BACKLOG_EXPORT]. Team members with days off in the sprint: [CAPACITY_DETAILS]. Sprint length: [SPRINT_LENGTH]. Velocity of the last three sprints: [VELOCITY].

Compute capacity per person (days available times hours per day, with focus time stated), compare the total with the velocity range, and propose a sprint goal and the items that fit, showing the total effort selected against the lower velocity bound. Treat velocity as a guide, not a target. Identify items not ready, dependencies and risks, and mention that capacity settings in the sprint view may need to be filled in by the team [VERIFY].

Return a sprint backlog table with a confidence column (high, medium, low) and how you chose it, a capacity table with the arithmetic for every number, a list of items to leave out, a few stretch items to pull in if the sprint goes well, and the questions for planning.

Fill in before use

Optional: type your details and the prompt above updates. Nothing is saved or sent.

Replace each bracketed placeholder with your own details, then paste into Any AI or another assistant.

See an example result (fictional data)
Invented figures: 5 people, 10-day sprint, 6 person-days off, 6 productive hours per day. Capacity = (5 x 10 - 6) x 6 = 264 hours. Last velocity: 22, 26, 24 points; average = 24, range 22 to 26.
Plan: select items totalling 22 points. Sprint goal: users can export their data. Left out: 2 items without acceptance criteria. Check: selecting 22 points is the bottom of the 22 to 26 range, which leaves room for one absence. Dependencies: the export story needs the permissions story to be finished first, so it is placed second. Risk to watch: the two items without acceptance criteria could grow, so they stay out of the sprint until they are refined.

Illustrative only, made-up data. Your results will differ and must be reviewed.